Milwaukee, Wisconsin · Est. 1962
Where to buyCareersEspañol
Case study

Case study: cutting changeover time 40% at a Wisconsin dairy

Replacing 18 legacy transfer pumps with PD rotary lobe units and front-loading seals took product changeovers from 55 to 33 minutes.

Rotary lobe pump on a dairy line

The plant runs eleven products across four lines and changes over up to six times a shift. Seal replacement on the old pumps required pulling the pump from the line.

Front-loading seals on the PD Series are replaced in place in under ten minutes. Combined with CIP-optimised rotors, the plant recovered more than 300 production hours in the first year.